Sabine Hagspiel
Sponsoring, promotional items, events, lettering
St. Gallen
St. Gallen
Andreas Schönenberger
Projekt lead crawler cranes & heavy lifting
St. Gallen
St. Gallen, Bassersdorf
Open vacancies at our locations
EMIL EGGER AG is present at strategically important locations. This makes it possible to offer the customer an optimal service. In addition, this prevents unnecessary long journeys to customers, which in turn is in line with our environmental concept of reducing CO2 emissions.
ALWAYS WELL INFORMED
Traffic restrictions on weekdays for trucks January to March 2023
We are pleased to inform our customers and partners about the traffic restrictions on working days for trucks in the…
Cooperation with Bystronic Laser AG
In 2016, Bystronic Laser AG started the cooperation with EMIL EGGER. What began with simple warehouse logistics has developed over…
Replacement beaver bridge in Biberbrugg with 1000 tons crane
Numerous onlookers followed the work of replacing the 60-year-old beaver bridge in Biberbrugg from September 30 to October 2. Toneatti…
Crane work for power pole assembly
Several cranes from the EMIL EGGER fleet were deployed in the Engadine to ensure smooth assembly: an 80-ton crane, a…
All-terrain crane Tadano AC 7.450-1 Operation in Dübendorf
Tadano AC 7.450-1 mobile crane in operation on a high-rise construction site in Dübendorf. Due to the confined space, a…
Transportation of long goods
Our specialty, in addition to the 24-hour distribution service in Switzerland, is the transportation of special sized cargo.
Loader crane logistics
With our powerful truck-mounted cranes (20 to 100 m/t lifting capacity), we not only transport your goods, but at the…
Derailed railcar put back on tracks thanks to two EGGER cranes
On Sunday, July 17, 2022, a train of the Appenzeller Bahnen derailed in Wasserauen after colliding with a car. To…
Transport and warehouse logistics
In addition to handling all general cargo formats, whether pallets, packages or long goods, EMIL EGGER AG has a good…
42 m high observation tower was completed in three strokes
The wood used for the construction of the tower comes directly from the hardwood forest. Approximately 310 cubic meters of…